Summary for EOI For development Solar Energy along the Coast of Maharashtra

Solar Tenders
Typography
1. Organisation Name Maharashtra Maritime Board
2. Tender/ EOI No. Not Applicable
3. Work Description Development of Solar Energy along the Coast of Maharashtra
4. Tender/ EOI Fee Not Applicable
5. EMD Not Applicable
6. cost of work Not Applicable
7. capabillity Not Applicable
8. location The locations for the project can be proposed anywhere alongside the coastline of Maharashtra, wherever the party would feel confident to establish a viable project yielding revenue to them and that the project would be able to act as a catalyst to further maritime and economic development of the region.
9. Pre Bid Date 09/01/2017  11:00 at 3rd Floor, Ramjibhai Kamani Marg, Ballard Estate, Mumbai - 400 001
10. Bid Opening Date Not Applicable
11. Document Download Start Date 16/12/2016
12. Document Download End Date Not Applicable
13. Bid/ EOI Submission Start Date Not Applicable
14. Bid/ EOI Submission End Date 31/01/2017 at 16:00
17. Period Of Work Not Applicable
18.

Name

Address

Chief Executive Officer, Maharashtra Maritime Board (MMB), Indian Mercantile Chambers, 3rd Floor, Ramjibhai Kamani Marg, Ballard Estate,Mumbai - 400 001 

    Phone: 022-22655641

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

MSME Benefit: Not Applicable

JV /CONSORTIUM: Not Applicable

SCOPE OF WORK:

Maharashtra Maritime Board has vast coast line of 720 Km. With ample Sunshine available throughout the day. it is intended to tap this energy resource to generate power. The proposals can be submitted for off shore / on shore Solar Energy development. The company can use any suitable technology. However preference would be given to those technologies and bidders, who have a demonstrable track record. 

Alternative which bidder can opt for are-

Offshore Solar Energy – By erecting Solar panels in Sea

Onshore Solar Energy – By erecting Solar Panels on Ports, Jetty, Beaches, Sea coast land etc.

The project includes development, operation and maintenance of suitable Renewable Energy method along the coast of Maharashtra.

Project Details:

o Details of location

o Arrangement or model of implementation/ operating the project

o Size of the project in terms of type of the area required, machinery required,

any other requirement which is necessary to run the project successfully.

o Estimated capital cost

o Estimated implementation period and phasing, if any

o Facilities to be provided by MMB

TECHNICAL ELIGIBILITY CRITERIA: Not Applicable

FINANCIAL ELIGIBILITY CRITERIA: Not Applicable

 

 

 

 

 

 

 

 

 

Translator

Advertisement

SolarQuarter Tweets

Follow Us For Latest Tweets

SolarQuarter Join the Journey of Pan India B2C Solar Rooftop Series in Your Cities; visit https://t.co/Ab6kpz9SRT for more deta… https://t.co/Y4oCRboELh
Monday, 14 August 2017 10:24
SolarQuarter SolarRoofs India wishes you a very Happy Independence Day!!! https://t.co/s28rPfG4ui
Monday, 14 August 2017 10:23
SolarQuarter SolarQuarter In Convestion with, >> Mr. KishorShinde, General Manager, Maharashtra Energy Development Agency >> Mr…https://t.co/o5Jcr8j3oB
Monday, 14 August 2017 09:13
SolarQuarter In conversation with Mr.Chris Prengels, CEO,Tiger Power https://t.co/8BqIT9VNh0
Friday, 11 August 2017 09:20
SolarQuarter BePresent With Biggest CXOs of Indian Renewable Energy Sector For DelegateRegistrations, contact: Ms. Pratika Jath…https://t.co/w44NCJOaUu
Tuesday, 08 August 2017 09:41

Advertisement
Advertisement